IP Tower Memphis

International Paper was new construction. During the first few weeks of the project, it rained constantly so when there was a break in the weather we brought out an extremely large crew to speed things up. We were able to roof the building in 22 days which allowed the general contractor to start working on the inside of the building much sooner than expected. We installed 3.5” polyiso, HD coverboard, and fully adhered 80 mil TPO roof system. We used a safety monitor at the high roof which was 170 feet in the air and did not have any parapet walls. After the project started, a screen wall was added that did not have a roofing detail. We were able to come up with a field wrap in order to flash in all screen wall posts and electrical outlets for the AC units. Because it was new construction, we had to repair 100 holes from other trades throughout the project. We also helped the metal wall panel contractor complete their metal work at the parapet walls to speed things up on the job as well.

« Back
Testimonials

 The price was competitive, they showed up on schedule, the job was completed on time, and the workmanship was top notch.

- Gregg R. Overman
Owner, The River City Soap Co.

 This year, hail damaged the roofs of all our buildings, twenty-nine buildings total. Fortunately, insurance covered the cost of the repairs. As requir

- Christine Ashcraft
Executive Director at the Gallaway Housing Authority.

 I have worked with Medford Roofing and Repair on two construction projects in the Memphis area. The first project was a 3.5 million dollar renovation

- Mitch Ballard
Superintendent Linkous Construction Co. Inc.

Medford Roofing inc @ 2017 All rights reserved

WebSite Design and Development by eBiz Solutions