Medford Roofing banner

Gap between two buildings

Gap between two buildings where the addition was built so we built a wall/ expansion joint by installing 2x's, filled with insulation, then installed a 3" sponge backer rod, and then EPDM flashing.

Request a Quote


Medford Roofing, Inc.