Electrolux, Memphis, TN

Problem Presented: Both buildings were new construction. The flat guardhouse deck was installed incorrectly and was not going to allow the proper drainage. There was no detail provided for the area where the metal and TPO roofs met between the two buildings. Over 200 penetrations and complex AC units provided an abundance of detail work.

Solution: A fully tapered polyiso system was installed at the guardhouse in order for the water to drain properly. TPO membrane was head welded to wrap the internal gutter between the TPO and metal roof and the drains.

« Back
Testimonials

 The price was competitive, they showed up on schedule, the job was completed on time, and the workmanship was top notch.

- Gregg R. Overman
Owner, The River City Soap Co.

 This year, hail damaged the roofs of all our buildings, twenty-nine buildings total. Fortunately, insurance covered the cost of the repairs. As requir

- Christine Ashcraft
Executive Director at the Gallaway Housing Authority.

 I have worked with Medford Roofing and Repair on two construction projects in the Memphis area. The first project was a 3.5 million dollar renovation

- Mitch Ballard
Superintendent Linkous Construction Co. Inc.